Access Self Storage

Bracknell

Customer: Rebus Holdings Ltd
Programme: 53 Weeks

The refurbishment of Access Self Storage included the introduction of 2 new goods lifts from the lower ground level to the new third floor level. The addition of the third floor required the design and installation of new structural steelwork connected back to the existing steel frame.
All works were undertaken while the existing tenant occupied an area of the lower ground floor level.

53

Weeks

Rebus Holdings Ltd

Client/End User:

Peter Lawrence Stallworthy

PM/Client:

MAA

Architect/ Designer:

Bradbrook Consulting

Engineer:

Peter Lawrence Stallworthy

QS/Cost Consultant:

53 weeks

Programme: