Camberley STIHL HQ

STIHL HQ in Camberley is a purpose-built headquarters and distribution facility delivering modern logistics accommodation alongside office, training and amenity spaces, designed to support long-term operational efficiency and sustainability.

Client

Andreas STIHL

Sector

Commercial Offices

Completed

May 2023

Size

121,000 sq ft

Programme

42 weeks

Sustainability Credentials

BREEAM: Very Good

Architect

Hale Architects

Engineer

Alan Wood & Partners

About This Project

Project Overview
STIHL HQ, Camberley comprises the construction of a 121,000 sq ft headquarters and distribution facility designed to support STIHL GB’s operational and administrative functions. The development includes a 97,000 sq ft warehouse incorporating advanced picking systems, alongside 25,000 sq ft of headquarters accommodation providing office space, training facilities, a technical workshop and staff amenities. The scheme delivers a consolidated, high-quality operational base aligned with STIHL’s long-term business requirements.

Project Requirements
The client required a modern headquarters and distribution facility capable of supporting advanced logistics operations while also providing high-quality office, training and staff facilities. Key requirements included the integration of efficient warehouse picking systems, flexible workspace, specialist training areas and robust sustainability credentials. The project also required delivery within a defined programme to enable timely occupation and operational transition.

Glencar’s Role
Glencar was appointed under a Design & Build contract to deliver the headquarters and distribution facility, coordinating design development, construction and stakeholder interfaces through to completion and handover.

Scope of Works
Enabling Works / Civils & Infrastructure
- Site preparation and infrastructure works
- External service connections and utilities coordination

Building / Superstructure
- Construction of a 97,000 sq ft warehouse facility
- Integrated headquarters accommodation totalling 25,000 sq ft
- Steel frame structure with high-performance building envelope

Fit-Out & Building Services
- Advanced warehouse picking systems
- Office fit-out and training facilities
- Technical workshop and staff restaurant
- Mechanical and electrical building services installations

External Works & Landscaping
- Formation of service yards and access routes
- Car parking areas and external circulation
- Installation of EV charging infrastructure

Technical & Delivery Challenges
The project required close coordination between warehouse operations and headquarters accommodation to ensure efficient workflows and operational separation where required. Integrating advanced picking systems alongside office and training spaces demanded careful sequencing and detailed coordination of building services. Sustainability measures, including photovoltaic installations and EV charging infrastructure, were integrated without compromising programme delivery.

Delivery Conditions Addressed
- Integrated headquarters and logistics facility
- Advanced warehouse systems installation
- Sustainability-led design requirements
- Programme-driven delivery
- Multi-user operational spaces

Sustainability & ESG
The facility achieved a BREEAM Very Good rating, supported by the installation of photovoltaic panels covering approximately 17,000 sq ft of roof area and 26 electric vehicle charging points. These measures contribute to reduced operational energy demand and align with STIHL’s environmental objectives and long-term sustainability strategy.

The Outcome
STIHL HQ, Camberley delivers a high-quality headquarters and distribution facility that brings together logistics, administration and training functions within a single, efficient asset. Completed within programme, the development provides a future-ready operational base designed to support STIHL’s continued growth and operational excellence.